A hotel is several buildings in one. Bedrooms, public areas, kitchens, function rooms, a spa or pool, and back of house, each with its own demands, all running off plant that has to work seven days a week without being heard or seen.
Noise is the first requirement
In most buildings, ventilation noise is an annoyance. In a hotel it’s a review.
Guest rooms need air without the guest being aware of it, which puts weight on:
- Fan selection and speed, with EC fans running slower rather than throttled
- Attenuation in the ductwork, and enough of it
- Breakout noise from plant rooms adjacent to rooms or corridors
- Vibration isolation, so the structure doesn’t carry it
- Terminal velocities low enough that the diffusers are silent
Our guide to AHU noise reduction techniques covers the options, and EC vs AC fan motors explains the fan side.
Occupancy that changes constantly
A hotel’s load is genuinely unpredictable. Rooms empty and fill, function rooms go from nothing to two hundred people and back in an evening, and the restaurant has peaks and long quiet stretches.
Running everything flat out all day wastes a great deal of energy. Demand control, zoned systems and controls that know what’s booked make a real difference. See our guides to demand controlled ventilation and AHU controls and building management systems.
Kitchens
Hotel kitchens are a significant extract load, and they need matched supply air or they pull air from everywhere else in the building, including guest corridors. Odour migration into public areas is one of the most common complaints we’re called to investigate.
Grease management and cleanliness are compliance matters as well as practical ones. See commercial kitchen ventilation solutions and TR19 ductwork cleaning.
Pools and spas
If the hotel has a pool, it brings a ventilation problem of its own: high humidity, chemical-laden air and a building fabric that suffers badly if moisture is allowed to condense in it. Pool ventilation needs its own plant and its own corrosion-resistant specification. Our guide to swimming pool and leisure ventilation covers it.
Back of house
Laundries, plant rooms, stores and staff areas all need ventilation too, and they’re usually the first thing squeezed when space is tight. Pressure relationships matter here: laundry and kitchen areas should not be pushing air towards guest spaces.
Energy, and why it adds up
Hotels run 24 hours a day, so inefficiency compounds faster than in a building that empties at six. The measures that pay back quickest are heat recovery, EC fans and controls that respond to actual occupancy. Our guides to heat recovery ROI and payback periods and AHU running costs set out the numbers.
Replacing plant without closing
This is the part that worries hotel operators most, and reasonably so. A hotel can’t shut for a fortnight while plant is changed.
It doesn’t need to. The work is planned around occupancy, done in phases, with temporary ventilation where it’s needed and noisy work scheduled when it affects fewest guests. Where access won’t take an assembled unit, we build it in place. We’ve done that approach on airports, hospitals and retail sites where stopping wasn’t an option, as set out in ventilation for live operational facilities and our flat-pack AHU guide.
Rooftop plant on a city centre hotel brings its own logistics, which we cover in replacing AHUs in rooftop and high-rise plant rooms.
Air quality and guest experience
Guests notice stuffy rooms even when they couldn’t name what’s wrong. Good filtration, proper fresh air rates and clean units are what prevent it. See how your AHU affects indoor air quality and AHU hygiene.
How we could help
We design, build, install, refurbish and maintain air handling units for hotels and hospitality buildings, including bespoke units where plant space is tight. See our air handling units page or browse our projects.
Get in touch to talk about your building.
Frequently asked questions
Yes, with phased works, temporary ventilation where needed and careful scheduling. We’ve done equivalent work in airports and hospitals.
Usually distribution or control rather than capacity. It’s worth investigating before adding plant.
By getting the supply and extract balance and the pressure relationships right. It’s almost always a balance problem rather than an extract capacity problem.
About the author
Written by Richard Keys, Director at i-Flow Technologies. Read more about our team on our About Us page: https://i-flowtechnologies.com/about-us/
