Colmore Row AHU Upgrade

Client Brief

We were commissioned to upgrade the air handling units (AHUs) serving a large office block, with the primary goal of improving energy efficiency and reducing long-term running costs.

A key part of the project was integrating the upgraded equipment with the building’s existing BMS to allow for seamless monitoring and control.

Client

Colmore Row Offices

Project Type

AHU Upgrade

Location

Birmingham, UK

Scope Of Work

Our scope of works included:

This structured approach ensured that both the mechanical and control elements of the system worked together efficiently from day one.

Our Approach

To meet the project goals, we carried out a detailed site assessment to determine the most cost-effective upgrade path.

This included reviewing current fan performance, existing control strategies, and integration options with the building’s BMS.

Outcome

The project achieved significant energy savings, with early data confirming reduced power consumption and validating the ROI projections.

The client is on track for a payback period within their target, while also benefiting from:

  • Improved reliability through new components
  • Enhanced control capability via BMS integration
  • Lower carbon emissions and running costs
  • Extended AHU lifespan

The result is a future-ready system delivering efficiency, reliability, and long-term value.

Project Gallery

Ready to discuss your air handling requirements?

Whether you need a bespoke manufacturing solution, professional installation, or ongoing maintenance support, our expert team is here to help. Complete the form below and we’ll get back to you to discuss your project.

Download Brochure

Enter your details below to download our brochure

"*" indicates required fields